One of the most common questions we hear at Metal & More Interiors is: “How long will my modular kitchen installation actually take?” Whether you are getting a stainless steel modular kitchen, an aluminium modular kitchen, or a galvanized steel kitchen installed in Hyderabad, this guide gives you the complete picture — from day one to final delivery.

Quick Overview: Total Modular Kitchen Installation Time

The total time for a complete modular kitchen installation in Hyderabad ranges from 30 to 60 days, depending on kitchen size, material type, design complexity, and site readiness.

Kitchen TypeEstimated TimelineKey Variable
Stainless Steel Kitchen35 – 50 DaysSS grade, shutter finish
Aluminium Modular Kitchen30 – 45 DaysProfile type, accessories
Galvanized Steel Kitchen30 – 40 DaysCoating, colour selection
Full House Interiors45 – 75 DaysScope of work, rooms
Pro Insight

At Metal & More Interiors, we commit to project completion within 45 to 60 days from order confirmation. Steel and aluminium kitchens are often faster than wooden kitchens because modules are precision-fabricated off-site at our workshop.

Phase 1 — Design Consultation & Finalization

L-shape classic modular kitchen design consultation — Metal and More Interiors Hyderabad

Classic L-shape modular kitchen — one of the most popular layouts during design consultation

Day
1
Phase 1 — Design
Initial Consultation & Kitchen Vision
  • First meeting with your design team at Metal & More
  • Discussion of lifestyle, cooking habits, and storage needs
  • Choosing between stainless steel vs aluminium
  • Layout selection: L-shape, U-shape, straight, or parallel
  • Understanding your approximate budget range
Virtual or In-Showroom
Day
2
Phase 1 — Design
3D Design Presentation & Material Selection
  • 3D kitchen layout visualization shared with client
  • Shutter finish selection: matte, gloss, textured, powder-coated
  • Hardware brand selection — Hettich, Hafele, or Ebco
  • Countertop material: granite, quartz, or SS top
  • Colour palette and handle style finalization
Design Approval Stage
Day
3
Phase 1 — Design
Quotation, Contract & Advance Payment
  • Detailed itemized quotation provided
  • Payment schedule and contract signed
  • Advance payment (40–50%) to begin fabrication
  • Estimated delivery date confirmed
Project Officially Starts

Phase 2 — Site Measurement & Detailed Planning

L-shape kitchen site measurement and planning — modular kitchen Hyderabad

Precise site measurement ensures every cabinet fits perfectly — a critical step before fabrication begins

Day
4–5
Phase 2 — Site Work
On-Site Measurement Visit
  • Precise measurement of kitchen area (wall-to-wall, height, slab depth)
  • Plumbing and drainage point mapping
  • Electrical point locations — chimney, hob, refrigerator, microwave
  • Window and door clearance checks
  • Wall condition assessment for drilling and fixing
Critical Step — Don’t Skip
Day
6–7
Phase 2 — Planning
Final Working Drawing & BOQ
  • Final shop drawings (elevation and plan view) prepared
  • Bill of Quantities (BOQ) finalized with exact module dimensions
  • Appliance cutout dimensions locked in
  • Design freeze — no major changes after this stage
Fabrication Can Begin
Important Warning

Any design changes requested after working drawing approval (Day 7) can delay your project by 7–15 days and may attract additional charges. Finalize all decisions before Phase 2 ends.

Phase 3 — Manufacturing & Fabrication at Workshop

This is the longest phase. All cabinet modules, shutters, and accessories are precision-cut and fabricated at our workshop before coming to your home — so there is zero disruption to your daily life.

Straight steel modular kitchen fabrication — Metal and More Interiors Hyderabad

Straight steel kitchen modules — fabricated off-site at our Secunderabad workshop with precision CNC cutting

Day
8–12
Phase 3 — Fabrication
Raw Material Procurement & Cutting
  • Premium 304 grade stainless steel sheets or aluminium profiles sourced
  • CNC cutting of all cabinet carcasses to exact dimensions
  • Shutter panels cut and edge-banded or PVC-wrapped
  • Internal accessories sorted: drawer channels, baskets, hinges
Workshop Phase
Day
13–18
Phase 3 — Fabrication
Assembly, Welding & Powder Coating
  • Cabinet frames welded or assembled with anti-corrosion fasteners
  • Powder coating or PVD finish applied on shutters
  • Quality check on each module for dimensional accuracy
  • Handle fitment, soft-close hinge testing, and drawer alignment
Quality Control Phase
Day
19–25
Phase 3 — Fabrication
Trial Assembly, Testing & Packing
  • All modules dry-assembled at workshop for trial fitting
  • Countertop stone slab or SS top templated
  • Modules carefully packed with protective foam and wrap
  • Delivery schedule confirmed with client
Ready for Delivery

Phase 4 — Civil & Electrical Site Preparation

While fabrication happens at our workshop, your home site must be made ready. This parallel phase runs simultaneously and is the homeowner’s responsibility.

Aluminium modular kitchen site preparation Hyderabad — civil and electrical work

Aluminium L-shape kitchen — wall tiling and electrical points must be ready before installation day

Day
15–17
Phase 4 — Civil Work
Plumbing & Drainage Adjustment
  • Sink drain point positioned correctly per working drawing
  • Water inlet lines for dishwasher/RO adjusted
  • Old counter demolition (if renovation project)
  • Wall tiling completed before cabinet installation
Homeowner Responsibility
Day
18–22
Phase 4 — Electrical
Electrical Points & Appliance Wiring
  • Chimney/hob power point at correct height above slab
  • Microwave, mixer, refrigerator dedicated points wired
  • Under-cabinet light wiring laid in conduit
  • Earth wiring for stainless steel kitchen safety
Licensed Electrician Required

Phase 5 — Delivery & Installation at Your Home

Parallel steel modular kitchen installation Hyderabad — Metal and More Interiors

Parallel steel kitchen installation — all modules arrive pre-fabricated for rapid, clean on-site assembly

Day
26
Phase 5 — Installation
Module Delivery & Site Unloading
  • All packed modules delivered to your home
  • Delivery checklist verified against BOQ
  • Site access prepared: elevator booking, floor protection laid
  • Installation team briefing and layout marked on walls
Installation Day 1
Day
27–29
Phase 5 — Installation
Base Cabinet & Wall Cabinet Fixing
  • Wall bracket rail fixed at precise height using laser level
  • Base cabinets aligned, leveled and anchored to wall
  • Wall-mounted cabinets hung on aluminium rail system
  • Corner units and pantry units positioned
  • All cabinets plumb-checked and level-corrected
Installation Days 2–4
Day
30–33
Phase 5 — Installation
Countertop, Sink & Appliance Integration
  • Granite/quartz/SS countertop placed and sealed
  • Sink cutout done and under-mount sink fixed
  • Hob and chimney cutouts made and appliances set
  • Soft-close hinges and drawer channels adjusted
  • Custom handles and knobs fitted
Installation Days 5–8
Day
34–35
Phase 5 — Installation
Internal Accessories & Storage Fitting
  • Kitchen racks, pull-out drawers, and basket units installed
  • Dustbin unit, bottle pull-out, and cutlery organizer fitted
  • Under-cabinet LED lighting connected and tested
  • Plumbing connections for sink and dishwasher finalized
Installation Days 9–10

Ready to Start Your Modular Kitchen Project?

Get a free design consultation and instant estimate from Hyderabad’s leading steel kitchen specialists.

Phase 6 — Finishing, Snagging & Final Handover

U-shape aluminium modular kitchen handover — Metal and More Interiors Hyderabad

U-shape aluminium kitchen — final walkthrough and handover with warranty documentation

Day
36–40
Phase 6 — Snagging
Snagging Inspection & Punch List
  • Thorough client walkthrough of all installed modules
  • Hinge alignment, shutter gap, and drawer smoothness check
  • Countertop edge finish and silicone sealing inspection
  • All snagging items noted for team correction
Client Inspection
Day
41–44
Phase 6 — Corrections
Punch List Corrections
  • All snagging items rectified by the installation team
  • Touch-up powder coat repair if needed
  • Final silicone bead at wall-slab junction
  • Anti-scratch protective film removed from SS surfaces
Corrections Complete
Day
45
Phase 6 — Handover
Final Handover & Warranty Documentation
  • Complete client walkthrough and satisfaction sign-off
  • Warranty card issued: 15-year on galvanized, lifetime on SS
  • Care and maintenance guide handed over
  • Balance payment cleared and after-sales contact shared
Your Kitchen Is Ready
Metal & More Commitment

We guarantee project completion within 45 to 60 days from order confirmation. Our steel and aluminium kitchens are fabricated at our own Secunderabad workshop — zero dependency on external vendors, tighter quality control throughout.

Factors That Affect Your Installation Timeline

Factors That Can Delay Installation

  • Late design approvals — Changing the design after working drawings are frozen adds 1–2 weeks
  • Civil work delays — Incomplete tiling, plastering, or plumbing from your civil contractor
  • Appliance unavailability — If a specific chimney or hob model is out of stock
  • Import hardwareHafele or Hettich imported accessories may take 10–15 extra days
  • Festival season rush — October–December is peak in Hyderabad; book at least 2 months ahead
  • Large kitchen size — U-shaped or island kitchens above 120 sq ft need more fabrication time

Factors That Can Speed Up Installation

  • Fast design decisions — Clear brief and quick approvals save 5–7 days
  • Site readiness — Tiling done before installation day cuts on-site time significantly
  • Standard sizes — Straight kitchens with standard modules are fastest to fabricate
  • In-stock accessories — Choosing from our standard hardware range avoids import delays
  • Off-peak booking — January to March is quieter with faster turnaround

Timeline Comparison by Material Type

PhaseStainless SteelAluminiumGalvanized Steel
Design & Consultation3 days3 days3 days
Measurement & Planning4 days4 days4 days
Fabrication at Workshop18–22 days14–18 days12–16 days
Civil & Electrical Prep7–10 days (parallel)7–10 days (parallel)7–10 days (parallel)
Installation at Site8–10 days7–9 days6–8 days
Snagging & Handover7–10 days5–7 days5–7 days
Total Timeline40–49 Days33–41 Days30–38 Days

Pro Tips to Speed Up Your Modular Kitchen Installation

Before You Start

During Fabrication

  • Complete all civil work during the fabrication phase to avoid delays after delivery
  • Get electrical points marked and wired before the delivery date
  • Ensure clear access path for large module delivery
  • Keep the kitchen area clear of furniture and belongings on installation day
Did You Know?
  • Stainless steel kitchen installation is 3x faster than site-built wooden kitchens because all modules arrive pre-fabricated
  • Metal kitchens require zero curing time — unlike wood kitchens where paints and laminates need drying
  • Our zero-maintenance steel kitchens need no post-installation polishing or varnishing
D
Dilip Kumar
Founder & CEO — Metal & More Interiors
With over 10 years of experience in durable interior solutions, Dilip Kumar pioneered stainless steel and aluminium kitchen design in Hyderabad. He specializes in termite-proof, rust-resistant kitchen systems built to last a lifetime. Metal & More Interiors is based in Yapral, Secunderabad and serves all of Hyderabad.